Feb 23, 2022 Tso lus

QA Rau Core Drilling 9 - Wireline Core Barrels

1. Piav qhia cov kauj ruam hauv cov kab hauv cov tub ntxhais drilling.

ü a. The drilling proceeds until core blockage or until the inner tube are filled with a core sample.

ü b. The overshot, which is attached to a wireline, is either lowered down the drill string or pumped into the drill string.

ü c. The overshot catches the inner tube assembly and releases it from the outer tube assembly.

ü d. The overshot and the inner tube assembly are hoisted up to the surface.

ü e. A new inner tube group is pumped down , or up, the drill string until it latches in the outer tube assembly.

ü f. The drilling starts new round again.


2. Cov khoom tseem ceeb twg ua rau cov kab hluav taws xob hauv lub thoob muaj?

ü Outer tube group

ü Inner tube group

ü Overshot assembly

core barrels cgegtech geo equip tech wuxi cget


3.Qhov twg cov khoom tseem ceeb ua rau sab hauv thiab sab nrauv lub rooj sib txoos ntawm cov hlau kab tub ntxhais chim muaj?

ü The outer tube assembly includes the following parts:

Sab hauv Tube Stabilizer

Xauv coupling

Lub nplhaib tsaws

Adapter Coupling

Lub raj sab nraud

Reaming plhaub

Pob Zeb Diamond Drill Bit

ü The inner tube assembly includes the following parts:

ib. Lub taub hau sib dhos

b. Lub raj sab hauv

c. tsaws xub pwg

d. Nres lub nplhaib

e. Core Lifter

f. Core lifter case


4.Qhov twg yog qhov sib txawv tseem ceeb ntawm lub taub hau taub hau rau lub taub hau taub hau rau lub taub hau taub hau thiab lub taub hau taub hau rau lub taub hau ntawm lub taub hau taub hau?

ü On a conventional core barrel the inner and the outer tube is threaded to the core barrel head.

ü On a wire-line core barrel the inner tube is threaded to the core barrel head and this so called inner tube assembly is then held in place by a set of latches and the landing ring and shoulder.


5.Dab tsi yog lub luag haujlwm ntawm lub latches thiab lub nplhaib tsaws hauv cov hlau kab tub ntxhais chim?

ü The latches prevent the inner tube assembly from advancing up the drill string.

ü The landing ring prevents the inner tube assembly from penetration too far into the outer tube assembly.


6.Vim li cas nws tseem ceeb heev uas lub puab raj sib dhos tau tsaws nyob rau hauv qhov tseeb txoj hauj lwm ua ntej lub drilling pib.

ü It is of outmost importance that the inner tube assembly actually has landed in the correct position before the drilling starts. If this, for some reason, is not the case and the drilling starts with the inner tube assembly in the wrong position this will be pushed into the drill string by the core sample.


ü The core sample will then be stored in the outer tube during drilling and the driller will probably loose the complete core from that particular core run.


7.Yuav ua li cas lub driller paub hais tias lub puab raj sib dhos tau tsaws nyob rau hauv qhov tseeb txoj hauj lwm?

ü All wire line core barrels have some kind of a valve which should indicate that the inner tube assembly has landed. There are a number of different designs but two basic types can be identified. Both basic types of valves works on the principle that they block the water passage until the inner tube assembly has landed. When this happens the water pressure must reaches a preset value in order to open the valve and to give free passage for the flushing water.


ü An experienced driller does however have a number of ways to establish that the inner tube has landed in the correct position. He knows the time it takes for an inner tube assembly to travel down to the outer tube assembly. He listens for the specific sound that can be heard when the inner tube assembly lands in the correct position.


8.Qhov twg yog qhov zoo thiab qhov tsis zoo nrog lub nyias -kerf core chim raws li piv rau tus qauv core chim?

ü A thin-kerf diamond drill bit contains fewer diamonds than a standard bit and

ü is therefore cheaper. A thin kerf bit does also require a lower feed force than a

ü standard bit and thus it has the possibility to drill a straighter hole.

ü A thin kerf bit produces a larger core sample than a corresponding standard core bit. A larger core sample is always an advantage for the geologists.

ü A disadvantage with the tin kerf wire line core barrel is that it can not withstand

ü rough treatment and they are therefore not recommended for drilling in very broken formation.


https://www.cgegtech.com/

Xa kev nug

whatsapp

Xov tooj

Tug

Kev nug